ABOUT US
ZHEJIANG HONGTAI AUTO PARTS
公司介绍 公司介绍
ABOUT US
Research development group


The company's technology center currently has 55 engineers, 5 assistant engineers, 22 technicians, and 23 mold technicians
Capable of independent development and design, as well as synchronous development and design with clients
Capable of design verification, using ANSYS for CAE analysis, able to verify design schemes at any time
All molds, fixtures, and gauges are independently designed, processed, and manufactured
Development cycle: 15 days for handmade parts, 25 days for semi tooling parts, and one month for tooling parts
The annual production of developed molds reaches over 2000 pairs

  • 2008

    Formally established

  • 300+

    Enterprise employees

  • 12000

    Plant area